The VandlSystem saves the contractor money with reduced cost of application in terms of material, labor and equipment rental. VandlSystem with its quick 1-2 hour re-coat window allows the complete VandlSystem of 1, 2 or 3 coats to be applied same day, without the need to come back and finish the next day. The VandlSystem has been developed with a one component formula, saving time normally spent mixing two component products and additional time waiting for product to cure. Material usage can be reduced 10% - 30% as the VandlSystem does not have a limited POT life. Opened material left at the end of the day or job does not have to be thrown out, but can be re-used on the next project. With a low VOC, interior application costs are reduced with no special respirator protection required for workers. Impact and discomfort to building occupants is virtually eliminated with a low odor formula. Cleanup is quick and easy with water and soap.












